Estimates and confidence interval for the fixed-effect “location” and the end point mean velocitya
Estimate | SD | 95% CI | T | P | |
---|---|---|---|---|---|
(Intercept) | 23.85 | 0.86 | (22.15–25.55) | 27.47 | <0.001 |
I | −0.67 | 0.80 | (−2.26–0.9) | −0.84 | 0.4 |
III | 5.87 | 0.79 | (4.32–7.43) | 7.41 | <0.001 |
↵a Location II is taken as base. This means that the estimate of the increase/decrease from I (respectively III) to II is calculated by comparing the mean velocity at segment I (respectively III) with the mean velocity at segment II (Intercept).